|
№ |
Type of work |
Price, hrn.* |
|
1 |
Design of trade, trade & business centers, public buildings. All stages of design including the project and work documentation. |
negotiable |
|
2 |
Design of apartment houses, hotels and recreation centers. All stages of design including the General Design and Construction Design Stages. |
negotiable |
|
3 |
Design of townships with complex functional infrastructure. All stages of design including the General Design and Construction Design Stages. |
negotiable |
|
4 |
Design of auto showrooms, gas stations, service stations, car washes. All stages of design including the General Design and Construction Design Stages |
negotiable |
|
5 |
Design hangars, warehouse complexes of logistic centers. All stages of design including the General Design and Construction Design Stages |
negotiable |
|
6 |
Individual project of average architectural complexity (individual dwelling house). |
from 60.00 per m2 |
|
7 |
Implementation of a complicated idea composition of a customer (individual project). |
from 110.00 per m2 |
|
8 |
Design of conceptual architectural and urban solutions for building and development of territories or reconstruction. |
from 18.00 per m2 |
|
Execution of design works for obtaining of TD (technical directions) |
||
|
1 |
LOAD CALCULATION for electric supply of the object (for obtaining of TD). Determination of loads and needs of electrical installments, and electricity consumers by types at the object. |
from 3000.00 |
|
2 |
LOAD CALCULATION for water supply, drainage (for obtaining of TD). Determination of water consumption quantity, amount of wastewater (domestic, irrigation, fire fighting). |
from 3000.00 |
|
3 |
LOAD CALCULATION for gas supply (for obtaining of TD). Determination of gas consumption volumes, considering heat loss and the type of heating equipment. |
from 3000.00 |
|
4 |
LOAD CALCULATION for heat supply of the object (for obtaining of TD). Determination of the total heat load of the object, including heating, hot water supply, ventilation, technology. |
from 3000.00 |
|
Design by sections |
||
|
1 |
Section HV (heating, ventilation, internal networks ) |
from 10.00 per m2 |
|
2 |
Section WD (water supply, drainage, internal networks) |
from 10.00 per m2 |
|
3 |
Electric networks section. Internal electric networks (after the interior design with placement of lighting and electrical devices ) |
from 10.00 per m2 |
|
4 |
Section AIE. Accessing the impact on the environment. |
from 2000.00 |
|
5 |
Section POWP. The project of organization of the whole process. |
from 2000.00 |
|
Coordination, budget documentation |
||
|
1 |
Development of the project for approval and putting into operation of willfully constructed objects. |
negotiable |
|
2 |
Urban justification: a) placement an object of urban development; b) Entry of changes to city planning documentation. |
negotiable |
|
3 |
Budget documentation, combined calculation of estimates. Compilation of local estimates on the basis of the finished project. Compilation of the estimated budget of the object based on local estimates. |
from 3000.00 |
* The cost of design work is not final and is formed after the determination of complexity and scope of work.